For decoration, the most afraid thing is that the construction unit shoddy, Jerry built, and such things are common in the decoration industry, and the victims are the majority of decoration consumers. So, how to avoid the construction unit shoddy, Jerry built? As an owner, we should clearly observe Qiu Hao both in the pre decoration inspection process and in the decoration construction process. 1. The phenomenon of Jerry built wall paint score of 1.5 points: latex paint is the most common wall decoration material at present. In specific construction

in decoration, the most afraid thing is that the construction unit shoddy, Jerry built, and such things are common in the decoration industry, and the victims are the majority of decoration consumers. So, how to avoid the construction unit shoddy, Jerry built? As an owner, we should clearly observe Qiu Hao both in the pre decoration inspection process and in the decoration construction process

1 wall painting

cut corners score 1.5 points

phenomenon: latex paint is the most common wall decoration material at present, which can be brushed, roller coated or sprayed in specific construction. If workers are not serious or perfunctory during construction, small color differences often appear. This is especially true of latex paints with darker colors

how to avoid experts' warning: before using latex paint, you need to add a certain amount of water, and the prepared latex paint should be used up at one time. The paint of the same color should also be painted at one time. If the wall needs to be repaired after construction, the whole wall should be painted again

2 sewer pipeline

cut corners score 2 points

phenomenon: when the construction team is carrying out decoration, sometimes in order to cut corners, it pours a large amount of cement, sand and concrete fragments into the sewer. The direct consequence of this is to seriously block the sewer, causing the kitchen and bathroom to run away due to poor drainage. Although there are no major problems in the final acceptance of some projects, there are always problems of poor drainage

how to avoid experts' warning: strictly supervise the construction team and do not use sewers as garbage lanes. After the waterway construction is completed, fill all water basins, basins and bathtubs with water, and then waterproof at the same time to see whether the drainage is smooth and whether there is leakage in the pipeline

3 wire connector

cut corners score 2.5 points

phenomenon: when electricians install sockets, switches and lamps, the construction unit cut corners and does not connect wires according to the construction requirements. Especially when consumers use some water heaters, air conditioners and other electrical appliances with large power consumption, switches and sockets are heated and even burned, which brings great losses to consumers

how to avoid experts' warning: during construction, supervise electricians to carry out construction in strict accordance with the operating procedures. After all switches and sockets are installed, be sure to use them actually to see whether there is heating in these parts

4 wall and floor tile paving

cut corners score 3 points

phenomenon: paving wall and floor tiles is a highly technical process. If the workers cut corners, they are most likely to have problems such as hollowing of tiles and uneven joints. In addition, the cement and adhesive used for paving tiles are also exquisite. If the proportion is unreasonable, there will also be problems such as falling off

how to avoid experts' reminder: according to the "quality acceptance standard for family room decoration projects" issued by the Beijing Municipal Construction Commission, it is required that the paving of wall and floor tiles should be flat and firm, with clear patterns, no dirt and mortar marks, basically the same surface color, uniform joints, plates without cracks, corners and missing edges, and local hollowing should not exceed 5% of the total

5 wall grooving

Jerry built index 3.5 points

phenomenon: buried pipelines must be grooved on the wall and ground before they can be buried. A few workers carried out brutal construction during the slotting operation, which not only damaged the load-bearing structure of the building, but also may cause damage to other nearby pipelines

how to avoid experts' warning: before construction, confirm the direction and location of the pipeline with the construction team leader again. For different wall structures, the requirements for slotting are also different: the load-bearing wall in the house is not allowed to be slotted, and the wall with insulation layer is easy to cause cracking on the surface after slotting, while the slotting on the ground should be careful not to damage the floor, causing trouble to the downstairs residents

6 joint decoration

cut corners score 4 points

phenomenon: at the junction of some walls with doors and windows, as well as the junction of two different colors of paint, it is also where workers often perfunctory. You often see that the coatings between emulsion paint and wood are mixed with each other, and various problems occur at the joints

how to avoid experts' warning: it is very important to deal with joints, and you must supervise workers to work carefully. Never cut corners. If two colors of paint are connected on the wall, the adhesive tape must be pasted on the edge of the first color during construction, and then the paint of another color must be painted on it. In this way, as long as the adhesive tape is torn off after construction, the whole joint can be very neat

7 wires through pipes

cut corners score: 4.5 points

phenomenon: in the construction of home decoration, almost all wires are threaded in PVC pipes and buried in the wall. Therefore, after the wire is threaded into the PVC pipe, the consumer cannot see it at all, and it is difficult to replace it. If the workers are not careful in operation, the wires will be twisted in the pipe, causing hidden dangers of electricity. If workers deliberately cut corners, they will use wires with connectors or thread several wires in the same PVC pipe

how to avoid experts' warning: consumers had better buy Wires by themselves, then supervise workers' operation on site, and conduct power on inspection after installation. In addition, consumers must let the decoration company leave a "pipeline diagram". When the electrician just buries the wires into the wall, he can number these walls and draw a plan, then draw the direction and specific position of the wires with a pen, indicating the direction from the floor above, from the ground below and adjacent to the wall, especially the joint position of the pipeline, so that once there is a fault, the line position can be found immediately

8 facet treatment

cut corners score: 4.5 points

phenomenon: the so-called "facet" is a small place that consumers can't see and don't pay much attention to, such as the upper edge of the door, the bottom of the windowsill, the inside of the heating hood and other places. Some workers will cut corners here, and even don't do any treatment

how to avoid experts' warning: remember that any object has six planes, and don't ignore any detail when checking the project quality

9 ground leveling

Jerry building score: 5 points

phenomenon: the ground of some houses is not flat enough, and it needs to be re leveled during decoration. If the workers are not careful or deliberately rough, it will cause the problem of "more and more uneven", and the cement mortar used in the construction will greatly increase the ground load and bring hidden dangers to the safety of the building

how to avoid experts' warning: before the ground leveling, the base treatment of the ground must be done first, and then the ground leveling must be carried out with cement mortar. After the cement dries out, use a special level to determine the flatness of the whole ground, and then proceed to the next step of construction

10 base treatment

cut corners score: 5 points

phenomenon: before painting emulsion paint and paving wall and floor tiles, the base treatment must be done well. Some workers cut corners in this aspect during construction, which may cause uneven walls, color difference after latex paint is applied, or discoloration and falling off of latex paint, or poor pasting of ceramic tiles

how to avoid experts' warning: in the paving construction of wall and floor tiles, you should pay attention that tiles cannot be directly paved on the surface of lime mortar, lime paste, paper reinforced lime paste, machete lime paste and latex paint, but only after the base surface is cleaned. The bonding slurry used between the ceramic tile and the base shall be prepared in strict accordance with the construction standards and proportions, and the cement and bonding adhesive materials with the specified grades shall be used, which cannot be prepared at will

when applying emulsion paint, you must pay attention to whether the wall putty is evenly and smoothly applied, and whether the grinding and rolling are in place. In addition, you should pay attention to whether the emulsion paint is properly proportioned